HOPE, Ind. — State Road 9, north of Hope, will close Monday, July 11, for bridge work.
The $179,000 project includes patching and a modified concrete overlay of the 90-foot long, three-span bridge. The repairs are expected to last about 3 weeks.
The posted detour will use State Road 252, I-65, U.S. 31 and 25th Street. Approximately 3,910 vehicles use the road daily.



