Search

New sidewalk construction approved for Columbus Airpark

Courtesy-Facebook

COLUMBUS, Ind. — Local officials have boosted pedestrian safety and infrastructure connectivity near the Columbus Airpark. The Columbus Redevelopment Commission voted unanimously to approve up to $184,094 for sidewalk installations at the airport.

Airport Director Bryan Payne outlined the scope of work, which includes a 5-foot concrete sidewalk along Arnold Street to connect the newly redeveloped Indiana Air National Guard Armory and parachute rigging unit to nearby access routes.

Additionally, a new sidewalk segment along Poshard Drive will link student housing and Ivy Tech Community College Columbus to a new bus stop located at Wade Drive and Poshard Drive.

Contractors selected for the project will also install a flashing crosswalk pedestrian signal along Arnold Street to slow surrounding traffic and assist pedestrians. The project will be funded out of the Airport TIF allocation area.

More from Top Stories

Community Calender

  • Mattress Fundraiser

    This is a fundraiser for the Columbus North HS Choir program, where the HS cafeteria will be turned into a mattress showroom.

    at Columbus North High School
  • Coffee with CASA

    Learn, connect and make a difference. Speak to current volunteers, staff members to learn more about the volunteer role.

    at Gramz Bakery
  • Bingo Night

    Join Advocates for Children for a fun night of Bingo on Thursday, October 22 from 6–8 PM at The Elks Lodge! 🎟️ Tickets are $40 ➕ Extra Bingo cards are $20 🏆 ...

    at The Elks Lodge

Today's Weather

  • Bartholomew County Weather

    Sunny

    High: 72°F | Low: 39°F

Follow Local News Digital on